Project: Cozy4   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Preston Kavanagh   -  
Project:   Cozy - Mark IV   -   VIEW REPORTS
Total Hours:4433.6
Total Flight Time:
Total Expense:$33393.25
Start/Last Date:Sep 01, 2003 - No Finish Date
Engine:IO-360-A3B6D
Propeller:Hertzler Silver Bullet 66 x 78
Panel:Garmin G3X + ipad
 
Friendly URL: https://eaabuilderslog.org?s=Cozy4

Home or Last Project Picture

Mar 07, 2007     Master Brake Cylinders - (12 hours)       Category: C09 Lnd Gear
01-10-2009 and 01-11-2009:

This weekend I installed some nut plates to hold the oil reservoirs. I put them on the back face of the nose gear pivot support box, which is out of the way but easy to inspect during the pre-flight, and also conveniently very close to the master cylinders.

To do this I marked and drilled out the locations where nut plates would go, then used temporary bolts through the reservoirs to hold the nuts plates in position while I floxed them in. I did this on Saturday. I used wax in the bolt holes to protect them. On Sunday, I removed the reservoirs and put a layer of BID across the face, then a sheet of plastic, then clamped the reservoirs back on so the BID will cure in a flat layer to support the reservoir mounting brackets. Next time I'm at the hangar I'll drill the holes back out and permanently install the reservoirs with their final (short) bolts.


 